We are pleased to advise that the New EMR Delivery Body Portal is now open for registration. You can access the New EMR Portal by visiting the New EMR Delivery Body Portal webpage and clicking on the New EMR DB Portal Log In button. Please see Latest News article published 22 Jan 2024 for further details. T1 2024 2025 and T4 2027 2028 CANs have now been released. The CfD Application Assessment Window for AR6 and results will be released on the 20th May 2024
SharePoint
  • add link
  • add page
  • close

    Connection Arrangements

    Certain Capacity Providers are currently only able to defer submission of connection agreements to the Delivery Body at the time of Prequalification if a Distribution CMU applying for a T-4 Agreement.

    Distribution Connection Agreement

    New Build Distribution connected CMUs need to provide deferred distribution connection agreements to the Delivery Body by 18 months (T-4 Auction) or at Prequalification.

    Private Network connections

    New Build CMUs connected to a Private Network need to provide confirmation that the Private Network has an agreement for connection and use of Distribution Network with the relevant Distribution Network Operator. 

    Transmission Connection Agreement

    Transmission connected CMUs must provide a Connection Agreement stating Transmission Entry Capacity (TEC) during Prequalification. Transmission Connection Agreements cannot be deferred. 

     

    Link to Guidance document​​ (Section G.8 of Prequal Guidance)

    Latest News
    REFRESH

    Error loading news!

    There are no news to show.