Access to this EMR Delivery Body Portal is currently restricted due to a planned system outage taking place on 05 and 06 October.
SharePoint

​​​​

​​​​​

T-4 Auction 2016 - Published Round Results


 

Capacity Market Rule 5.5.18 Requires the Auctioneer to Announce and Publish the following information prior to the start of each Bidding Round:

  • ​​The Bidding Round Price Spread.
  • ​​​The Potential Clearing Capacity at the Bidding Round Price Floor​ for that Bidding Round.
  • Except in relation to the first Bidding Round, the Excess Capacity as at​ the start of the Bidding Round..

 

​The Bidding Round Price Spread will be £5/kW for each Bidding Round, as described in the Auction Guidelines.  The "Potential Clearing Capacity" is identical to the demand curve at a given price. The Excess Capacity is the excess of supply over demand at a particular price. The Excess Capacity is rounded to the nearest 1 GW, where the Excess Capacity falls below 1 GW, "Below 1 GW" will be displayed. Once the (unrounded) Excess Capacity falls below zero, the Auction will clear, subject to Capacity Market Rule 5.9.

These values are displayed in the Table below and charted in Figure 1. They will be updated approximately10 minutes prior to the start of each Bidding Round. This coincides with the release of this information to Bidders.  

The Graph below shows the Rounded Excess Capacity added to the Potential Clearing Capacity, that is, the Remaining Capacity, or Supply. The supply will only be shown at a Bidding Round Price Cap/Floor, with a linear interpolation within a round.  Two curves will be shown, giving upper and lower bounds for the supply, given the rounding to the published Excess Capacity figures.

By Examining the Capacity Market Register, it can be verified that the Capacity Entering the Auction is 69777.050 MW De-Rated Capacity. This Capacity is the Supply at the Auction Price Cap in Figure 1 below.

All prices are in 2015/16 prices.​​​​​​​​


 

The Auction has cleared in Round 11. There will be no further Bidding Rounds. 

The Clearing Price is £22.50 kW/Yr. 

The total quantity of De-Rated Capacity is 52425.302 MW.


The full Provisional Results Report is available here.

The Provisional Results Report​ Appendix A is now available in .xlsx format here​.​

The Auction Results will remain Provisional until the 20th of December 2016 (Auction Results Day).

 The Final T-4 Auction Results Report is available here​.

The Final T-4 Auction Results Report​ Appendix A is now available in .xlsx format here​.​

final.png
Figure 1: Rounded Remaining Capacity



Round Number​​​

​Bidding Round Pric​​e Spread​

(£/kW/y)

​Potential Clearing Capacity at the Bidding Round Price Floor​ (MW)

​Excess Capacity as at the start of the Bidding Round​ (MW)

Round 1​​75 - 70
50488.462
​-
​Round 2​70 - 65​​50776.923​19000
Round 3 ​65 - 60​51065.385​​19000
Round 460 - 5551353.84618000​
Round 5 55 - 5051642.308​ 16000​
Round 6 50 - 45​51822.449​16000
Round 7 45 - 4051975.510​​​15000
Round 840 - 35​52128.571​​​15000
Round 9 35 - 3052281.633​​​14000
Round 1030 - 25​​52434.694​8000
Round 11​25 - 20​52587.755​​6000
Round 12​--​​-